Fraud Warning: It has come to our attention that various international organizations or individuals have been offering false employment opportunities at Aecon Group Inc. These individuals will offer to fast track Canadian working visa applications in exchange for a payment. Such offers are fraudulent and intended to steal from the victims.

Aecon Group Inc. employment policies and processes in Canada involve personal interviews, and candidates who seek employment with us are never required to pay us any sum of money. To do so would be contrary to our business conduct guidelines and ethical practices. We take this matter extremely seriously and are working with the appropriate legal authorities to shut down such fraudulent schemes. Read more here
X
Safety First

Portlands Energy - Toronto, ON

The Portlands Energy Centre (PEC) is a natural gas-fired peaking station that produces power when demand is at its highest. Two gas-fired turbines produce the heat necessary to power the steam turbine which generates 550 MW of electricity, enough to provide power to 500,000 homes. PEC also has the capability to operate as a district heating plant, supplying steam and district heating for about three million square feet of either residential or commercial building space.


Aecon Constructors was awarded three (3) separate contracts totalling $60 Million to complete the Anchor Bolts Down civil components of the PEC project.


Aecon scope of work involved:

  • dredging the existing outlet channel for cooling water discharge
  • installation of 96” cooling water intake and discharge pipe through the site
  • construction of underground utilities and major foundations


As part of the major foundations, Aecon constructed an intake channel and pumphouse that included excavation to a 16m depth below lake level and placement of 3500 m3 of concrete.


Aecon initiated work in September 2006, with project completion posted in late August 2007. 